Six categories assessed in every InspectOS Lisbon apartment inspection

OE-licensed civil engineer · Bilingual report within 48 hours

Structural integrity and seismic risk

Settlement cracks, spalling concrete, corroded lintels, load-path assessment. Eurocode 8 seismic screening for pre-1983 buildings.

68% predate seismic code · CML/Programa ReSist

Moisture, damp, and insulation

Calibrated moisture meter and hygrometer readings, root-cause identification, and a recommended correction for each moisture zone.

Detects damp concealed by fresh paint

Electrical systems

Wiring condition, earthing protection, consumer unit, circuit breaker sizing. RTIEBT compliance assessment. Residential properties are excluded from mandatory periodic inspection under DL 96/2017.

No mandatory periodic check for residential

Gas and plumbing

Gas installation condition, Boletim de Inspeção de Gás status, pipe material survey, galvanic corrosion at joints. Pre-2018 installations: deadline 26 Aug 2028 (DL 97/2017).

Expired Boletim can weaken an insurance claim

Energy performance

ADENE EPC class review, thermal envelope, ventilation adequacy, and EPBD compliance trajectory. EPC is a separate legal document, coordinated in the same visit on request.

EPC required for all property sales · DL 101-D/2020

Legal conformity: DL 10/2024

Simplex Safe: as-built condition vs approved plans, Caderneta Predial, and land registry. Risk-scored 0–100 with legalisation recommendations.

RJUE Art. 98 fines · €498.80–€99,759.58