The papers say what may be rebuilt. The site shows what survives.
Bulging, lost mortar and open cracks at the corners.
Decides reuse, not the right to rebuild
Settlement, water against the base, a slope pushing on the downhill wall.
A roofless shell takes water into the wall cores every winter.
Measured on site against the caderneta, the certidão and any PIP drawings.
Sets the envelope a reconstruction can restore
Lean-tos, concrete annexes, raised roofs set against the licensing record.
A borehole needs an APA licence. A septic tank needs câmara approval and an APA discharge title.