Buying timeline · When to inspect
Inspect before the CPCV, while exit is still free
The CPCV commits your deposit (sinal) under Art. 442 of the Código Civil. Order the inspection in the window between the accepted offer and that signature, not after.
1
Offer accepted
Price agreed. The window opens, and it is often short.
2
Inspection
Engineer assesses the building; bilingual report in 48h.
Best moment
3
CPCV signed
Sinal committed. Exit now costs the deposit unless a clause allows it.
Leverage drops
4
Escritura
Deed completes. Defect liability transfers to you.
Locked in
No time before the CPCV? Sign with a resolutive condition tied to a satisfactory inspection report, so a serious finding can still unwind the deal without forfeiting the sinal.