New Build Snagging Inspection in Portugal
Defects documented before you accept the keys

A New Build snagging inspection is an independent handover survey of a new-build home in Portugal, carried out before you accept the keys. An engineer licensed by the Ordem dos Engenheiros (OE) documents every finish, system and waterproofing defect with dated photographs, the evidence a thorough snagging survey provides, so you can require the developer to correct them under warranty.

InspectOS New Build inspections are carried out by OE-licensed engineers, cost from €980, and deliver a photographic report with every item graded for conformity and any action prioritised, in English and Portuguese within 48 hours.

Portugal · Lisbon, Porto & Algarve
from €980Report in 48h36-point check

from €980 · Report in 48h

Book New Build inspection

How the Process Works

Step-by-step guide: from legal obligation to final certificate

  1. 1

    Before final payment or key handover

    Commission the snagging inspection before you accept the keys. Defects found at this stage are the developer's legal responsibility under the consumer protection warranty period.

    Before accepting keys
  2. 2

    Inspector assigned

    InspectOS matches you with an ITIC-certified inspector experienced in new-build defect detection. We target developer pipeline areas in Greater Lisbon and Porto.

    After booking
  3. 3

    Systematic defect survey

    Inspector checks all finishes, joinery, glazing, sealants, plumbing, electrics, roof, and waterproofing. Each item is recorded and classified as critical, major, or minor.

    2–3 hours on-site
  4. 4

    Snagging report for developer claim

    Formal snagging list delivered with photographic evidence and severity grades. Many new-build buyers discover defects after move-in; this report gives you the paper trail before deadlines pass.

    Delivered in 2–3 business days

Read the full new-build buyer's guide for the complete legal framework, contractual retention, and what to do if the developer refuses to act.

What a New Build snagging inspection is in Portugal

A New Build snagging inspection, formally a provisional reception (receção provisória), is an independent survey of a newly completed home, carried out at handover before you sign for the keys. In the United Kingdom this is a routine step; in Portugal it is still uncommon, even though the buyer carries the same risk. Since the Simplex Urbanístico reform (DL 10/2024) reduced mandatory municipal checks, no public body verifies the condition of your specific unit before you accept it. A new build snagging survey puts an OE-licensed engineer in the property to record what the developer's own quality control missed.

The output is a documented, photographic record of every defect, graded by severity. It is the difference between telling the developer the bathroom leaks and handing them a dated report that locates the defect, classifies it, and ties it to your warranty rights. For a new-build inspection in Portugal, that evidence is what turns a verbal complaint into an enforceable claim.

What we check at handover

The inspection follows a 36-point checklist across five domains: structure and finishes; moisture and insulation; electrical installation; plumbing; and an overall assessment covering regulatory compliance, fire safety and accessibility. Every item is photographed and graded for conformity, and any action needed is prioritised as immediate, short-term or medium-term.

Structure and finishes

Accessible foundations, beams, columns and slabs, plus interior and exterior walls, the facade, window frames and glazing, floors and ceilings. Hairline cracking, misalignment and uneven tiling are the most frequent findings and the easiest for a developer to correct while still on site.

Moisture and insulation

Signs of damp and condensation, terrace, balcony and roof waterproofing, wall and roof thermal insulation, thermal bridges, and natural and mechanical ventilation. Waterproofing failures are the highest-consequence items here, the ones that become first-winter leaks.

Electrical installation

The distribution board, earth connection, wiring, sockets, switches, and general and emergency lighting, checked against RTIEBT. A missing earth connection or unfinished earthing certificate is common and carries a safety, not cosmetic, weight.

Plumbing

Supply pressure and flow, water quality, taps and valves, interior drainage, sewage piping, traps, toilets and shower bases, function-tested wherever the water supply is connected.

Overall assessment

Overall impression and finish quality, regulatory compliance, fire-safety provisions and accessibility in the common areas. These are recorded as advisory items where a specialist or the developer must confirm.

#DefectSeverityNote
1Hairline cracks in plaster walls or ceilingsMajor76% of new builds
2Misaligned doors, windows or framesMajorPoor installation
3Window sealant gaps and draughtsMinorThermal bridge risk
4Balcony or terrace waterproofing failureCritical58% of cases
5Flat roof or gutter membrane defectsCriticalFirst-winter leaks
6Skirting boards and architraves poorly fixedMinor68% of units
7Uneven floor tiles or laminate gapsMajorTrip hazard
8Paint overspray, touch-up marks or incomplete finishMinorCosmetic but documented
9Kitchen cabinet alignment and soft-close failuresMinorWarranty claim
10Bathroom grout gaps and silicone sealant defectsMajorHidden leak risk
11Leaking taps, slow drainage or trap defectsMajorPlumbing warranty
12Non-compliant electrical outlets or missing earthCritical44% of new builds
13Incorrect circuit labelling on consumer unitMajorRTIEBT compliance
14Boiler or water heater installation defectsCriticalSafety risk
15AC unit installation or condensate drainage faultsMajorCommon in Algarve
16Missing or blocked ventilation grillesMajorCondensation risk
17Basement or garage damp and condensationMajor39% of units
18Communal area finish defects passed to buyerMajorDeveloper responsibility
19Missing operation manuals or warranty certificatesMinorHandover documentation
20Intercom, entry system or smart-home faultsMinorPost-handover cost

Based on InspectOS New Build inspections across Lisbon, Porto and the Algarve. Severity shown is the typical impact of each defect type.

Every defect above becomes a line in your complete snag list, cross-referenced to a photograph, so nothing depends on memory or goodwill once you have accepted the keys.

When to book: before the escritura or before key handover

The single most valuable window is the 24 to 48 hours before key handover. Book the inspection then and you can present the report to the developer while you still hold something they want: your signature. The formal handover, the receção da obra, is the moment your bargaining position is strongest and the moment most buyers give it away.

Where the deed and the keys are separate events, aim to inspect before the escritura. If the schedule does not allow it, an inspection in the first 48 hours after you take possession is still valid and still worth doing; the defects existed before you arrived, and the report dates them.

Do not sign the handover record clean

Avoid signing the auto de receção as received without reservation until the property has been inspected. Signing it clean can be read as accepting the unit in the state it is in.

Report in 48 hours, in English and Portuguese.

Book your New Build inspection

Your warranty rights on a new build in Portugal

Two legal regimes protect a new-build buyer, and they are often confused. Under the Código Civil (Art. 1225), the builder is liable for defects for 5 years from delivery. When you buy the finished home from a developer as a consumer, DL 84/2021 (in force since 1 January 2022) applies a longer guarantee: 10 years for structural defects and 5 years for everything else, both counted from delivery. The one-year denúncia deadline that caught out so many buyers under the old regime was abolished, and you have 3 years to act once you have reported a defect in writing.

None of these periods help you without evidence. A dated, engineer-signed report is what starts the conversation on your terms. The construction guarantee is only as strong as the documentation behind it, which is the entire reason to inspect before you accept the property.

The Ficha Técnica da Habitação check (DL 68/2004)

Every home built or altered since March 2004 must have a Ficha Técnica da Habitação (FTH), a technical datasheet of the property's characteristics as built. It is not optional paperwork: without it, the escritura cannot legally proceed, and the developer is obliged to produce it and hand you the original.

During the inspection, the engineer confronts what is physically in the property against what the FTH and the approved project declare. Where the built reality deviates from the documents, that is a recorded non-conformity, not a matter of opinion. It is a check no generic snagging list performs, and it is where undisclosed substitutions of materials and equipment surface.

What it costs, and whether it is worth it

A New Build snagging inspection with InspectOS costs from €980 for a home up to 200 m², with the report in 48 hours. Against the price of the home and the cost of correcting a hidden waterproofing or electrical defect a year after the warranty conversation has cooled, it is a small, fixed sum paid once.

If you are buying new to live in or to let, or buying from abroad, this is the one step that documents the property's true condition at the moment it becomes yours. Anyone planning to buy a home in Portugal on a new development should treat the inspection as part of the purchase, not an extra.

Frequently asked questions

Conclusion

A new home is not a defect-free home. Construction is fast, the developer's quality control is the developer's own, and the law no longer requires a municipal inspection before you accept the keys. The New Build snagging inspection puts the only independent check between the build and your signature.

It costs from €980 and takes 48 hours from visit to report. It documents every defect with a dated photograph, grades it by urgency, and ties it to your warranty rights, before the property becomes yours.

Sources: Código Civil Article 1225, Decreto-Lei 84/2021, Decreto-Lei 68/2004 (Ficha Técnica da Habitação), Decreto-Lei 10/2024 (Simplex Urbanístico), Eurostat 2020, INE 2024, InspectOS inspection data 2024–2026. Updated July 2026.