This website uses limited-risk AI systems in compliance with the European AI Regulation (EU AI Act). Compliance monitoring features are supervised by qualified professionals.

What a gas installation inspection checks: InspectOS Pro gas module

The InspectOS Pro gas module records a gas installation in eight sections, from the meter to the evacuation of combustion gases. It serves gas inspections in homes and in condominium buildings. The service and its price are at the end of this page.

InspectOS Pro is rolling out in phases. Some capabilities described below are still being built.

Gas module on the piping section, with the G, NG-1 and NG-2 defect classes
The piping section in the gas module. Tap to enlarge.

What the engineer records, section by section

Every field below is in the module, as the engineer fills it in on site. Items marked as checks are rated conforming or given a defect type.

  1. 01Property Identification

    Property Data

    • Municipality
    • District
    • Fraction
    • Building Type
    • Year Built
    • Floor Area
  2. 02Gas Supply & Metering

    Gas Type

    • Gas Type
    • Supplier

    Meter

    • Meter Location
    • Meter Accessibilitycheck
    • Meter Conditioncheck

    Pressure Regulator

    • Regulator Type
    • Regulator Conditioncheck
    • Supply Pressure

    Supply Pipe

    • Pipe Material
    • Pipe Conditioncheck
  3. 03Internal Piping Network

    Characteristics

    • Material
    • Routing Type

    Checks

    • General Pipe Conditioncheck
    • Supports & Fixingscheck
    • Corrosioncheck
    • Joint Integritycheck
    • Labelingcheck

    Tightness Test

    • Test Performed
    • Result
    • Test Pressure
    • Test Duration
  4. 04Shutoff Valves

    General Shutoff

    • Valve Present
    • Accessibilitycheck
    • Operabilitycheck

    Floor Shutoff

    • Valve Present
    • Accessibilitycheck
    • Operabilitycheck

    Appliance Shutoffs

    • Valves Present
    • Accessibilitycheck
    • Operabilitycheck
  5. 05Gas Appliances

    • Appliance Type
    • Brand
    • Model
    • Power
    • Location
    • Connection Type
    • Flame Condition
    • Safety Device
    • CO Reading
    • Appliance Classificationcheck
  6. 06Ventilation

    Combustion Air

    • Combustion Air Supplycheck
    • Air Openings Adequatecheck

    Room Ventilation

    • General Room Ventilationcheck
    • Kitchen Ventilationcheck

    Ventilation Grilles

    • Grille Conditioncheck
    • Grille Sizingcheck
  7. 07Flue Gas Evacuation

    Flue Type

    • Flue Type
    • Flue Material

    Flue Condition

    • General Flue Conditioncheck
    • Flue Terminationcheck
    • Condensation Draincheck

    Tests

    • Draft Test Performed
    • Draft Test Result
    • CO Spillage Test
  8. 08Site Observations

    • General Observations
    • Access Conditions
    • Inspection Limitations
    • Recommendations to Owner

What the law says

  • Under Decreto-Lei n.º 97/2017, a gas installation made more than 10 years ago and not remodelled is inspected every 5 years. (DL 97/2017, art. 21.º n.º 1 b))
  • The owner or usufructuary is responsible. The condominium answers for common parts, and a tenant only if the lease transfers it. (DL 97/2017, art. 17.º)
  • DL 97/2017 sets no fine for an owner who skips the periodic inspection. After a DGEG notice there are 3 months; then the distributor cuts the supply. (DL 97/2017, art. 29.º n.º 1; art. 21.º n.os 2, 3)
  • Defects fall into three classes: G, where supply is refused or cut at once; NG-1, to be repaired within 60 days; and NG-2, fixed at the next intervention. (DL 97/2017, art. 15.º)

What our engineers found

  • A DGEG-recognised EIG approved most of the gas installations it inspected in 2026 at the first inspection.
  • A pending result from the EIG means the non-conformities have to be corrected and the installation inspected again before it can be approved.

What this means for you: When an installation does not pass, the report lists each non-conformity so it can be fixed before the reinspection.

From the InspectOS 2026 inspection data, a random sample of our inspections.See the 2026 inspection data

Guides to read next

Frequently asked questions

How often must a gas installation be inspected?
A gas installation made more than 10 years ago and not remodelled is inspected every 5 years (DL 97/2017, art. 21(1)(b)).
What do the G, NG-1 and NG-2 defects mean?
They are the three classes in DL 97/2017, art. 15. With a G defect, supply is refused or cut at once. An NG-1 must be repaired within 60 days. An NG-2 is fixed at the next intervention.
Who is responsible for the gas inspection, landlord or tenant?
The owner or usufructuary. The condominium answers for common parts, and the tenant only if the lease passes the duty on (DL 97/2017, art. 17).

Book the visit

Book Inspection