This website uses limited-risk AI systems in compliance with the European AI Regulation (EU AI Act). Compliance monitoring features are supervised by qualified professionals.

How to read a home inspection report: the InspectOS Pro report

The InspectOS Pro report is the document produced from the checklist filled in during the visit. It opens with the cover and summary, continues with findings by section, and closes with the verdict and signature. Each finding carries one of four severity levels and can include photos.

InspectOS Pro is rolling out in phases. Some capabilities described below are still being built.

Section B findings in the report, with each checkpoint's answer and severity level
Findings by section in the report, with sample answers. Tap to enlarge.

The order of the document

  1. Cover: visit totals, responsible inspector, client, address and date
  2. Executive summary
  3. Property sheet
  4. Findings by section, with each checkpoint's answer, severity, notes and photos
  5. Severity scale
  6. Final verdict and signature

The engineer issues the report in Portuguese or in English, from the same answers. Each checkpoint can carry photos taken during the visit.

How to read the report before you sign

Read the report in the order the cover sets: critical findings first, then the red and orange checkpoints, then the rest. Each part answers a different question.

Cover

What it tells you: The cover gives four totals: checkpoints in the method, checkpoints answered, critical findings, and checkpoints rated improvement required or immediately dangerous. It also shows the responsible inspector, the client, the address and the visit date.

What to do: Read the critical findings first. If the number is above zero, go to those checkpoints before reading anything else. Check that the address and date match the home and the visit.

Cover and signature

Executive summary

What it tells you: The executive summary is where the engineer sums up, in their own words, what the visit found.

What to do: Use it to brief your lawyer, your bank or the estate agent. When you put questions to the seller, quote the checkpoint codes, such as C1.1 or D2.3.

Property sheet

What it tells you: The sheet identifies the property: typology, construction year, floor, fraction and reference. It also records the weather on the day of the visit.

What to do: Compare these details with the listing and the Caderneta Predial. A different typology or fraction is a question to ask before the CPCV.

Cover and signature

Findings by section

What it tells you: Each checkpoint shows the chosen answer, the severity level, the engineer's notes and the photos. Each section can close with its own notes, and additional images sit in a gallery afterwards.

What to do: Start with the red and orange checkpoints. Show the photos to the seller to point to the exact spot. Take each of these points into the negotiation before you sign.

Method

Severity scale

What it tells you: The scale explains the four levels used in the findings, from satisfactory to immediately dangerous. Each level has a colour, repeated on every checkpoint.

What to do: Use the scale to separate what must be settled before the deed from what can be planned afterwards.

Severity levels

Final verdict and signature

What it tells you: The final verdict gives the engineer's overall assessment. The document closes with the inspector's and the client's signatures, the InspectOS signature and the inspection date.

What to do: Keep the signed report with your purchase documents. The date records the home's condition on that day, which matters if a defect appears later.

Cover and signature

Parts of the report

What the law says

  • In a private sale, the buyer reports a defect within 1 year of discovering it and sues within 6 months of the report, all within 5 years of delivery. The burden of proof is on the buyer. (Código Civil, arts. 916.º, 917.º, 342.º n.º 1)

Guides to read next

Frequently asked questions

Where do I start reading an inspection report?
With the cover. It shows the critical findings and the checkpoints rated improvement required or immediately dangerous. If any number is above zero, go to those checkpoints before reading anything else.
Which language is the report in?
In Portuguese or English, as you choose. The method's checkpoints keep the same code in both languages, such as C1.1, so buyer and seller talk about the same point.
How long do I have to claim a defect after buying?
In a private sale, you report the defect within 1 year of discovering it and sue within 6 months of the report, all within 5 years of delivery (Código Civil, arts. 916 and 917). The burden of proof is on the buyer, and a dated report helps carry it.

Book the visit

Book Inspection